Assesment
Environmental Impact Assessment (EIA) / Environmental Management Plan (EMP) & related job
-
Alstom Preparation of Environmental Site Assessment Report at Alstom India Ltd., Durgapur under M & N Control Technique, Kolkata.
-
Kauntia Castings Ltd., Birshibpur, Howrah, W.B Installation of 9500 TPA of Finished Product (C.I & SGCI).
-
Purbanchal Cement Pvt. Ltd., Sonarpur, Kamrup, Assam Establishment for a Cement Plant with a production capacity of 500 TPD of Portland Slag Cement and Portland Pozalona Cement.
-
Vikas Castings, Jaladhulagori, Howrah. Set up a medium scale CI Foundry project of capacity 40 TPD CI castings.
-
Jawala Steel Pvt. Ltd., Durgapur, W.B. Installation of Pre heating furnaces production capacity 112500 MT.
-
Dev Ispat., Durgapur, W.B. Installation of a Foundry unit having capacity of 40 TPD.
-
Gripwell Engineering Co. (P) Ltd. Set up a small scale steel foundry project of 900 TPA capacity.
-
Gripwell Engineering Co. (P) Ltd., Domjur, Howrah Set up a small scale steel foundry project of 900 TPA capacity.
-
Datre Corporation Ltd., Falta Industrial Growth Center, Sect III, 24 Pgs. (S) Set up a medium scale foundry for manufacturing of valves & its allied components.
-
Allied Steel, Durgapur, West Bengal Set up a foundry unit having capacity of 40 TPD.
-
Etone India Ltd., Bally, Howrah, West Bengal Set up Rotogravure Cylinder manufacturing unit.
-
KIC Metaliks Ltd., Durgapur, W.B Set up a Foundry units having capacity of 100 Ton/day.
-
H.S. Foundry, Howrah, W.B. Set up a small scale foundry having capacity of 15 TPD.
-
Jinendra Investment Pvt. Ltd., Konnanagar, Hooghly Set up a Residential cum Commercial Housing complex.
-
Chel II, Hydel Power Project, Garubathan, Darjeeling Set up a mini Hydel Power station under Shyam Energy Ltd, Kolkata - 46.
-
Divine Vidyut Ltd. Set up a 20 MW Captive Power Plant.
-
Gangadhar Developers Pvt. Ltd., Siliguri, West Bengal Set up a Shopping Mall- “COSMOS” at Siliguri, West Bengal.
-
Manaksia Limited, P.S- Durgachak, Haldia, Purba Medinipur Expansion of exising Aluminium Rolled Products in Coils & Heat Form.
-
Durgapur Ferro Alloys Pvt. Ltd. Durgapur, West Bengal. For setting up a Coal washery, Coal slurry and Low Ash Metallurgical Coke Plant.
-
Durgapur Ferro Alloys Pvt. Ltd. Bonkati, Durgapur, West Bengal For setting up a Coal slurry floatation Plant.
-
Sova Ispat Ltd. Mejia, Bankura For setting up a Coal Mining Project.
-
Sova Ispat Alloys (Mega Projects Ltd. ) Angadpur Industrial area, Durgapur, W.B. For setting up a Ferro Alloys and Sub merged Electric arc furnace.
EIA Related studies for different Road Projects
- Environmental Management Service of 4 laning of NH2 - Environmental Monitoring work i.e., Air, Water, noise, soil analysis for 4lanning of NH2 from Km 517 to Km 581 under supervision of Gamuda WCT (India) Pvt. Ltd., Galsi, Burdwan. W.B.
- Environmental Management Service of 4 laning of NH2 - Environmental Monitoring work i.e., Air, Water, noise, soil analysis for 4 lanning of NH2 from Km 581 to Km 646 under supervision of Gamuda WCT (India) Pvt. Ltd., Chamrail, NH6, Howarh.
- Environmental Management Service of 4 laning of NH2 - Environmental Monitoring work i.e., Air, Water, noise, soil analysis during the operation and maintenance period of 4 laning of NH2 from Panagarh to Palsit section from KM 520 + 103 to km 548 + 929 under MAPEX Inrastructure Pvt. Ltd., Masagram, Burdwan.
- NH - 57 - Environmental Monitoring work i.e., Air, Water, noise, soil analysis for preparation of EIA related reports & Social Environmental Studies for NH-57 at Jharkhanda Road Project, Jharkhanda.
- NH-25 - Environmental Monitoring work i.e., Air, Water, noise, soil analysis for preparation of EIA related reports & Social Environmental studies for NH-25 at Mujaffarpur, Bihar and Lucknow, U.P.